Cowichan Watershed Board

  • Email
  • Facebook
  • RSS
  • YouTube
MENUMENU
  • About
    • Indigenous Co-governance
    • Our Principles
    • Board Members
    • Staff Team
    • Non-Profit Society
    • Supporters (Coming Soon)
    • Contact Us
  • Targets
    • Water Quality
    • Estuary Health
    • Salmon Sustainability
    • Wise Water Use
    • Watershed IQ
    • Water Flows
    • Riparian Plants
    • Target Working Groups
  • Projects
    • Koksilah Low Flow
    • Twinned Watersheds Project
      • Riparian Plants
      • Indigenous Flows
      • Fish Habitats
      • Big Dancing Fish
    • Weir Ready (Coming Soon)
    • River Cleanup (Coming Soon)
    • Speakers Series
    • Past Projects (Coming Soon)
      • Water Challenge (Coming Soon)
      • Superheroes (Coming Soon)
  • Library
    • Board Meetings
    • Governance Documents
    • Maps
    • Media
    • Presentations
    • Videos
    • Reports
      • CWB Reports
      • Other Reports
    • All Library Items
  • Latest News
You are here: Home / Flooding in the Lower Cowichan

Flooding in the Lower Cowichan

FishNavigatesLakesRoad_DebraBrash_TimesColonist_21Nov2010The lower slopes and floodplain of the Cowichan – Koksilah river system contain significant areas of agricultural land as well as rural, urban and industrial development. Dikes have been built along both banks of the Cowichan River to protect the developed urban core of the City of Duncan and the extensive agricultural and industrialized zones downstream. Dikes have also been constructed on lands of the Cowichan Tribes at various tiines including along the Koksilah River.

The valley has experienced many flood events resulting from high flows in the Cowichan River and its tributaries, and from ponding in low-lying areas during heavy rain events. Large flow events in the Cowichan River were documented in 1979, 1986, 2007, and 2009.

AerialLookingSouthOverLakesAndBeverley_DebraBrash_TimesColonist_20Nov2009The flood management area extends along the Cowichan River from below the Catalyst water intake down to the ocean and along the Koksilah River from just below Bright Angel Park down to the ocean. Also included are Somenos Creek and Somenos Lake.

In 2009, the Cowichan Valley Regional District commissioned Northwest Hydraulic Consultants to develop an Integrated Flood Management Plan. Conclusions from extensive studies indicated that none of the existing dykes have adequate freeboard for a 200-year flood event, and reported a number of other probabilities of high concern.

Coincident with the release of the Integrated Flood Management Plan, were the November 2009 and January 2010 floods.

TruckStuckOnBeverlySt_DebraBrash_TimesColonist_20Nov2009In June 2010, a three-phase federal – provincial infrastructure aid program was announced, which will enable the CVRD and Cowichan Tribes to implement some parts of the flood management plan.

The final report from the Integrated Flood Management Plan was presented to the CVRD's Regional Services Committee in May 2010. Click here to download the agenda package, including the Executive Summary, Conclusions, Table of Contents, and Map.

A summary of the Integrated Flood Management Plan was presented at the September 2010 meeting of the Cowichan Watershed Board. Click here to view presentation.  In addition a number of flood related issues were discussed on the Board and TAC's November 6, 2010 field trip.


Related Documents

Integrated Flood Management Project Applications, Presentation, September 2010

Lower Cowichan/Koksilah River Integrated Flood Management Plan – FinalReport
Northwest Hydraulic Consultants, September 2009
Contact the CVRD at 250-746-2500, or use its online form.

Map – Tier II and Tier III Priority Projects
Northwest Hydraulic Consultants, August 2009

CVRD's Integrated Flood Management Planning site

Like Us On Facebook

Facebook Pagelike Widget

Click image for Board Meeting Agenda Packages

CWB members-partial-2022

2022 Cowichan Watershed Board Members (5 members absent)

Cowichan Lake Weir Updates (Click image)

Final Design Concept image

Cowichan Lake Weir Updates (Click image)

Deep Dive! A story series about our Watershed.

The Discourse

Click for Cowichan Watershed feature stories from The Discourse.

Why Fish Need Water

Why Fish Need Trees

Latest News

  • Photos and Links from “Safeguarding XPey'” Speaker Night
  • Speakers Series Resumes! Mon March 20th 7pm.
  • Province invests $100 million for Watershed Security Fund and co-development of watershed security strategy
  • Watershed strategy co-developed with First Nations, $100 million invested

Sign up for E-News!

Board Meeting Notifications

Event Notifications

CWB Website

Home
About Us
Contact
Cowichan Basin Water Management Plan
Documents & Presentations
Privacy
Terms

Targets

Water Quality
Estuarine Health
Salmon Sustainability
Water Use
Watershed IQ
Water Supply
Riparian Area Protection

Cowichan Watershed

Introduction
Cowichan Lake
Quamichan & Somenos Lakes
Cowichan Estuary
The Weir

Logo Email

info@cowichanwatershedboard.ca

Mailing Address
4335 Riverside Road
Duncan, BC, V9L 6M8

Copyright © 2023 Cowichan Watershed Board - All Rights Reserved. | Design by MAC5 | Maintained by Shawn DeWolfe Consulting

sponsor logo
The Cowichan Watershed Board (CWB) gratefully acknowledges the financial support of the above organizations.